600bhp S1 Lotus Exige 07k 2.5T

Collapse
X
 
  • Time
  • Show
Clear All
new posts

  • biggerbigben
    replied
    Certainly looking forward to it, but must get back on the exige and get that finished first.

    Leave a comment:


  • Tractor Dave
    replied
    Cant wait to see you tackle that

    Leave a comment:


  • biggerbigben
    replied
    Originally posted by Tractor Dave
    Amazing!
    Is that a Ur arriving under the tarp?
    Close. Coupe Quattro come rust bucket

    Leave a comment:


  • Tractor Dave
    replied
    Amazing!
    Is that a Ur arriving under the tarp?

    Leave a comment:


  • biggerbigben
    replied
    Not much to visually show but lots of progress has been made!














    ]



    ....and I may have gone off piste and bought the next project a little ahead of schedule ;-)










    Leave a comment:


  • vonbeck
    replied
    thats pretty awesome keep up the great work and photos photos photos!!!!!!!!!!!!!

    Leave a comment:


  • SteveH
    replied

    Leave a comment:


  • biggerbigben
    replied
    Nearly ready to turn it over...








    Leave a comment:


  • fbatwork
    replied
    Fantastic work - can’t wait to see more updates!!

    Leave a comment:


  • Rikki Kitto
    replied
    This is gonna be terrifying in a good way

    Leave a comment:


  • biggerbigben
    replied
    Yes quite a bit, I’ve basically mocked up everything, pulled the engine out again and now I’m reinstalling for the final time. Hoping to get it started this summer.

    Final stages of mock up...




    New vacuum bagged twin skin roof being fitted/bonded...




    Making a new bulkhead, bonding into position, insulation and heat reflection plus new header tanks fitted. New larger fuel tank in with a1000 in tank pump also fitted...

    [/url]


    Test fitting new charge cooler pre rad and fitting hoses...




    Final pipework mock up.. all mock up plumbing done...




    Slippy diffy install...

    [/url]


    Where I am at now. Basically reinstalling everything for final time ready to be started. Just doing all the fuel and oil hoses / fittings at the moment...











    Leave a comment:


  • jaychen
    replied
    Hello mate, Any updates on this build?

    Leave a comment:


  • biggerbigben
    replied
    Thanks guys. Oil filter is easily accessible from gearbox side.. really great design by Issam..

    Leave a comment:


  • Tonybolony
    replied
    Originally posted by biggerbigben
    Engine is back from JNL Racing. Massive thanks to JP for the swift turnaround and impeccable advice / engineering skills.

    I didn't hang about. Wanted to mockup everything. Glad I did as lots of puzzles to solve and plenty of plumbing to get on with before it all comes out again. It's going to be a busy engine bay that's for sure.










    It all fits.. just!!





    Nice trainers

    Joking aside- looking at what you've done so far, this is gonna be the Doggies when it's finished

    Leave a comment:


  • Wizard-of-OD
    replied
    Originally posted by PRY4SNO
    Gonna be a tight job doing oil filter changes, might be worth doing a remote filter housing?

    Bay looks the definition of tidy, well done!
    Look closely at the oil filter housing

    Leave a comment:

Working...