Anybody have a clue what hydraulic pressure is applied to the bomb from the PAS while charging and what is the Nitrogen charge pressure of the bomb when empty of hydraulic fluid.
I have seen figures of the nitrogen pressure from 70 to 90bar charged and at 30bar when it needs to have the nitrogen charged.
I have a friend in the hydraulic game who said they can check mine and if there is a problem then they can overhaul it, it including replacing the bladder with the latest bladder material.
All he is asking for is the nitrogen charge pressure and hydraulic working pressure.
He also said he should be able to supply an equivalent replacement if necessary.
orsum
I have seen figures of the nitrogen pressure from 70 to 90bar charged and at 30bar when it needs to have the nitrogen charged.
I have a friend in the hydraulic game who said they can check mine and if there is a problem then they can overhaul it, it including replacing the bladder with the latest bladder material.
All he is asking for is the nitrogen charge pressure and hydraulic working pressure.
He also said he should be able to supply an equivalent replacement if necessary.
orsum

Comment