Right my S2 project is nearing completion and I've been thinking about ways to stiffen the shell as much as possible with going down the cage route. Error404 has given me some good ideas for bracing the exhaust tunnel, a front lower chassis brace and I'm going to weld in some front strut brace mounts onto the rear turrets for a brace which I'm going to triangulate to the rear sub frame mounts.
It's occurred to me that as I have no sound insulation and very thin carpet then I have about an 3/4 inch of space across the inside of the floor pan to play with. I was thinking along the lines of welding box section steel to the full length of both sills and the floor, as well as the exhaust tunnel then triangulating the whole lot with more box section and have some of the the joints run into the same areas as where I brace the tunnel.
This will also mean my lighten front carpet will sit at the correct height for the pedals.
Any in put welcome.
It's occurred to me that as I have no sound insulation and very thin carpet then I have about an 3/4 inch of space across the inside of the floor pan to play with. I was thinking along the lines of welding box section steel to the full length of both sills and the floor, as well as the exhaust tunnel then triangulating the whole lot with more box section and have some of the the joints run into the same areas as where I brace the tunnel.
This will also mean my lighten front carpet will sit at the correct height for the pedals.
Any in put welcome.

Comment