Started at 10.30 am finished at 16.30 and achieved the following
Replacement of front ball joint.
Strip-down/clean rebuild of 996 callipers.
Installed new textar pads to above.
Replaced brake fluid.
Replaced thermostat.
Flushed and refilled cooling system.
Repaired 2 leaks in my A/C system (won't no if it's worked till I get it gassed).
All went very well
Plans for tomorrow:
Replace rear brake pads.
Re-bleed brake system.
Clean inside and out.
I'm going for a well earned pint now
What did everybody else achieve today?

Started at 10.30 am finished at 16.30 and achieved the following
Replacement of front ball joint.
Strip-down/clean rebuild of 996 callipers.
Installed new textar pads to above.
Replaced brake fluid.
Replaced thermostat.
Flushed and refilled cooling system.
Repaired 2 leaks in my A/C system (won't no if it's worked till I get it gassed).
All went very well

Plans for tomorrow:
Replace rear brake pads.
Re-bleed brake system.
Clean inside and out.
I'm going for a well earned pint now

What did everybody else achieve today?






) Resecured the fuel lines, straightened out the fuel tank strap, drilled and tapped the strap mounting bolts. Its an on going project and now the weather is better it will be getting worked on a lot more.
).