Just did this today, and I must say it was a lot easier than expected.
Dropped the subframe a little by removing the two front main bolts, and removed the oilsump. Then it was just a matter of releasing the rodbolts and pushing the piston up and out (the head was ofcourse removed
).
Removed the rods from the piston, put the new rods and bearings in and chucked the piston back in the hole. On went the lower caps and the bolts were torqed to specification.
My first time ever doing a job on the car that turned out to be easier than expected!
Isn't it beautiful:

Next job is to put the head back on. Guess I'm gonna have to call a mate, doesn't look like a one-man job
:
Dropped the subframe a little by removing the two front main bolts, and removed the oilsump. Then it was just a matter of releasing the rodbolts and pushing the piston up and out (the head was ofcourse removed
).Removed the rods from the piston, put the new rods and bearings in and chucked the piston back in the hole. On went the lower caps and the bolts were torqed to specification.
My first time ever doing a job on the car that turned out to be easier than expected!
Isn't it beautiful:

Next job is to put the head back on. Guess I'm gonna have to call a mate, doesn't look like a one-man job
:

nice peace the head and intake


The thought makes me weak @ the knees.
I've got to take the head off mine to do the gasket but I'm planning on having my spare 7A head overhauled and modified to fit. This would obviously be the time to fit some uprated rods but as I was hoping to do the clutch as well, I think the cost is going to get out of hand! Even though I'm hoping to do a lot of the work myself, I really have no idea how much the head overhaul will cost, let alone the rest!!
Comment