
Cut the last bits holding the 2 halves together:


Sat happily on its legs:

Brought back in and welded under the windows to hold the door shuts. Have left the floor for now until the main hoop is in place then I know where I want the floor to go. Plan is to have the main hoop intersecting the 2 halves of the sill.




Screwed the B pillars in place to get an idea of where they are going to go:


Got over 25kg of metal cut out during shortening:

Finally chopped the dash panel out and opened up the A pillars to get a look at the damage!

How it stands tonight got a good bit more space to walk around it now with the 320mm cut out!

Next job is to get the roof on and sort the rust in the A pillars. Very happy with how its progressing!










































Leave a comment: