Building a S2 mk2 golf
Collapse
This is a sticky topic.
X
X
-
Can't wait to see the times it's going to be pulling at York??????????? should be fun! -
Exceptional!!! I love this project the build quality is very high keep it up!
Leave a comment:
-
ok, finally mounted the WG on the manifold this was a challenge trying to keep everything flowing good and steer clear of the turbo hanger which i made at the same time. Also the start of the exhaust is there in the form of a 4" DP unfortunately i cant find any 4" boxes so im reducing it to 3.5" to go under the diff.
On the other side the chargecooler prerad has been mounted and a suitable cowling has been fab`d.
Also put flexi ducting to the rad in but im not too sure how well this system will work, only time will tell.
So much more work to do, and i thought it was coming to an end.




Leave a comment:
-
Custom Cages state the bar lengths are cut with overlength to allow modification to fit your vehicle... Thats why its a kit form.Leave a comment:
-
I was suppose to be fitting one of these cages it was anightmare the main hoop was 50mm too high didnt come with the centre conecting sguare or bracing plates on windscreen mullions. it states in instructions that nothing was to be cut. so i gave up and said get some one else to do it as im not doing anymore as if it is wrong im not taking the blame and cost for it. for starters the base plates needed tapering down to fit in position.
Leave a comment:
-
You must have missed my link


It works a treat, i think i`ll wire the signals from both the sensors into the box
Leave a comment:
-
man i love your project, its amazing how you prepared it
every detail with precision done
i thought that my golf days where past when i begon to ride S power
but this one makes me drool A LOT
its gonne be a mad ride
greetsLeave a comment:
-
I have some braid like baz's, thought i would test it and it seems to be up to the job
What knock sensor will you use to wire to a dash light
Leave a comment:
Leave a comment: