I have been doing stuff on my S2 for the last 7 years I have owned it and spent too much money to even contemplate. Last couple of years I've done very little and enjoyed the car for what it is
However, this year is looking like a biggie in terms of work required to get it back to it's prime and seemingly a bit of a test in terms of my driveway DIY skills
So heres the list of work:
DONE so far in 2007:
New amplified aerial base replacement
Rear lights resealed
Boot seal refit and bootlid feet adjusted...ta-da no more leaks
Rear disc and pad replacement
Rear caliper carriers unsiezed and cleaned up
Front brake clean up
Centre guage backlights replaced
New gear gaiter
New rear drop links fitted
Rear Goodridge hoses fitted
Fit Alloy Centre Vent Plate
New steering rack install
Replace all main sensors dotted about engine and water rail
Replace power steering lines on the hydraulic circuit
Replace expansion tank
install new steering damper
intall new steering arms
Replace cam cover gasket
Replace power steering pump plug/seal
installed new engine mounts
Grit blast intake pipes, pcv pipe and water pipe on the block and powder coat
Grit blasted rear wishbones and powder coat
blast and powder coat the strut brace
Replace alloy alternator bracket
To Do:
engine removal....gulp
Replace the rear diff with 90 Quattro version (sourced & should be with me next week)
Replacement propshaft install with new centre bearing and cv's (in progress)
Replace heat shielding in engine bay
Replace diff mounts
Replace gearbox mounts
Replace snub mount with Sport Quattro version
Replace pressed front wishbones with forged (ready to go on)
New front ball joints
Replace rear wishbone bushes and ball joints
Replace top mounts at front
New Rear track rods
Source genuine 5 speed gearnob replacement
Change belts
Get aircon compressor resealed to cure oil leak
Replace clock faces
replace door rubber strips
Plus no doubt a host of stuff i find once the engine is out
Pics to come once the main parts arrive and I'll try and do a few BTDT's as I go.
Wish me luck
David
However, this year is looking like a biggie in terms of work required to get it back to it's prime and seemingly a bit of a test in terms of my driveway DIY skills
So heres the list of work:
DONE so far in 2007:
New amplified aerial base replacement
Rear lights resealed
Boot seal refit and bootlid feet adjusted...ta-da no more leaks
Rear disc and pad replacement
Rear caliper carriers unsiezed and cleaned up
Front brake clean up
Centre guage backlights replaced
New gear gaiter
New rear drop links fitted
Rear Goodridge hoses fitted
Fit Alloy Centre Vent Plate
New steering rack install
Replace all main sensors dotted about engine and water rail
Replace power steering lines on the hydraulic circuit
Replace expansion tank
install new steering damper
intall new steering arms
Replace cam cover gasket
Replace power steering pump plug/seal
installed new engine mounts
Grit blast intake pipes, pcv pipe and water pipe on the block and powder coat
Grit blasted rear wishbones and powder coat
blast and powder coat the strut brace
Replace alloy alternator bracket
To Do:
engine removal....gulp
Replace the rear diff with 90 Quattro version (sourced & should be with me next week)
Replacement propshaft install with new centre bearing and cv's (in progress)
Replace heat shielding in engine bay
Replace diff mounts
Replace gearbox mounts
Replace snub mount with Sport Quattro version
Replace pressed front wishbones with forged (ready to go on)
New front ball joints
Replace rear wishbone bushes and ball joints
Replace top mounts at front
New Rear track rods
Source genuine 5 speed gearnob replacement
Change belts
Get aircon compressor resealed to cure oil leak
Replace clock faces
replace door rubber strips
Plus no doubt a host of stuff i find once the engine is out
Pics to come once the main parts arrive and I'll try and do a few BTDT's as I go.
Wish me luck
David

Comment