    A little bit more work has been completed at the business end of the car.
    With the new DTA ECU the engine bay can be somewhat de-cluttered by going coil on plug.
    New ABY rocker cover was prepared.



    And bolted on, so the engine now looks like this (with the new coils).


    Leave a comment:


  • LHD_Kid
    replied
    Looking really good Chris... Almost there...!!!

    Leave a comment:


  • jogi730
    replied
    Continuing on the subject of heat, the air -box for the filter is now finished.
    This picture also shows Error_404's brake vacuum upgrade kit fitted




    Leave a comment:


  • jogi730
    replied
    The beefier CV joints and drive shafts also result in the downpipe running much closer to them. To avoid any potential heat problems, the offending item has been wrapped




    Leave a comment:


  • jogi730
    replied
    Rear calipers back on and fronts with mock fitting




    Leave a comment:


  • jogi730
    replied
    Caliper Carriers

    As with all modification work, fitting the new hubs has had some knock on effects which has slowed work down.
    New front caliper carriers were needed and courtesy of Alex (thank you), I have these on their way



    And hard anodised


    For some reason, the rear carriers still fitted

    Leave a comment:


  • LeafBox
    replied
    Impressive as always!

    Leave a comment:


  • sidrick
    replied
    Nice work!

    Leave a comment:


  • jogi730
    replied
    Bit by bit, getting there. The uprights and wheel assemblies are now on the car.











    Leave a comment:


  • jogi730
    replied
    Finding the rear hub carriers to move my project along has proved quite an experience.
    I found a pair, but these got lost in the post by DPD. The seller was good enough to offer a replacement. Someone he knew had some. Unfortunately, it would appear that persons mechanical knowledge is worse than mine – quite a feat! They could not get the brake calipers off so took to using an angle grinder to release the retaining bolts. To make matters worse, to clean things up a disc sander was used.
    So, I am still looking for a pair of hub carriers. For now, someone has very kindly lent me a pair to allow my project to move forwards. Alex (Error_404) also offered to strip and lend the ones from his own car until a set could be found. Massive thank you’s to good people who are prepared to go the extra mile to help fellow forum member out.
    So, at long last having obtained the carriers, I have a new back end waiting to go onto the car.

    Old uprights



    Stripped and assembled with new tubes and platforms for coil-overs

    Last edited by jogi730; 12 March 2019, 11:31.

    Leave a comment:


  • Error404
    replied
    Looking good Chris

    Leave a comment:


  • jogi730
    replied
    Still awaiting arrival of the hub carriers as the first lot that I found got lost in the post!
    Replacements were found and should be there soon.


    Last but not least for now, the Roose Motorsport hose kit was fitted so plumbing to engine almost complete.





    Leave a comment:


  • jogi730
    replied
    Fitted onto subframe which now also has new bushes all around and back onto the car.




    Leave a comment:


  • jogi730
    replied
    The subframes were off, so it made sense to have them shot blasted and powder coated.


    Leave a comment:


  • jogi730
    replied
    The 7A rear diff was fitted at this point with new mounting bush. This was partially for future proofing (the original smaller diff seals are NLA), but also to replace the drive shafts with much thicker (stronger?) 7A items to match the fronts.