I wonder if they're made of steel or they've remanufactured them in something that doesn't rust.
What setup you have at the front, shocks/bushes?
UrS4 2.2T Sedan project
Collapse
X
-
For all 3 fuel lines it was 350 euros. But if you skip the carbon filter return line ut was only 100 euros. Those "kits" have different art nr.
Well i cant tell any differens with the new bushings yet because i need to drive a bit more first. But i can hear a little bit more noise from the drivetrain, nothing disturbing but i hear a differens.Leave a comment:
-
So a few days ago the first test drive was made. Went good. But when i stopped at the gas station i saw something dripping from the car.. It was the fuel returnline that was leaking. I bought new pipes from Audi, was not so bad, like 100euro. I bought without the pipe for the active carbon filter as i dont use that any more and the price was 350Euro..
The new pipes that came with new mountings.

Art nr:

Yesterday i was at the wheel shop and did a wheel alignment. Then i started to assemble my "new" head.
Mounted the lightweight lifters and the 7A camshafts, here is the head resting in the sunlight:
Leave a comment:
-
Tackar
No i haven't, still runs on 98 octane. Yes, 1000cc injectors and a 044 pump, also changed the fpr to a 3 bar since the injectors only needed 3bars of fuelpressure as lowest.Leave a comment:
-
Jäklar vad fint
Have you converted to e85 allready ? And the fuel system you just put an 044 in the tank and changed the injectors ? Any guesses what hp that setup would do on e85?
///FilipLeave a comment:
-
-
Today i finished the brakeline and connected the brakes. Thought my exhaust was a little bit ugly to just mount back so i gave it some time with the grinder to give it some shine
Next step is to testdrive and then go and do a wheel alignment.
Leave a comment:
-
Today i got the time to mount the rear subframe. Assembled the thing and put it back on the car. Now i just have to make a new brake line and i'm done. Then i will make a wheel allignment. Hopfully it feels better on the road
Rear subframe assembled:

Mounted on the car:

Maybe i will put some time on the car tomorrow. Also got me some new hand brake wires. Feels wery good to cross this one of the list, been a lot of work the last days..Leave a comment:
-
Got some work done on the car. Cleaned the body and painted it.
Painted the tank and the rear diff. So in the weekend i will put the rear subframe on again
Body work:

Tank painted:

Rear diff painted and some mounted brackets:

Finally the tank is up again:
Leave a comment:
-
So today i thought i would be able to start with the rear body work. But instead i did some sandblasting with the small brackets and stuff. After looking at the rear end i realized that i would be stupid if i didn't pull the fuel tank down. The tank it self had some corrosion, and i wouldn't get acces to everything when i paint, so i decided to pull that one out as well.
Fuel tank down:

Fuel tank:

Now i'm only waiting for the paint and of course the time to clean everything and get it ready for paint. I wish my girfriend gave me moore time in the garage...
Leave a comment:
-
Shiny subframe [emoji6] [emoji106]
Gesendet von meinem GT-I9505 mit TapatalkLeave a comment:

Leave a comment: