One day the garage I rented leaked water thru one lightbar in the ceiling... Put some pressure on the chipboard and water ran thru a electric junction box (??google translate??) cut in the board over the lightbar.
I went outside and saw that whole roof was bent down in the middle by a big pile of snow
The problem was I had the rear totally stripped down and not wanting to have my car there anymore..... So I borrowed the rear subframe from my other S2, switched some mounts. Put it on the car and trailed it home...



Now I am thinking about the rear ARB
I have read alot about it on this forum and I have an extra front and rear S2 coupe shelf warmers.
With a FARB mounted in the rear the car might be to stiff for a streetcar.
So I was thinking of welding two rears together with metal plates and enough clearance so only one will be mounted.
Thoughts, ideas and experience are very welcomed
I went outside and saw that whole roof was bent down in the middle by a big pile of snow

The problem was I had the rear totally stripped down and not wanting to have my car there anymore..... So I borrowed the rear subframe from my other S2, switched some mounts. Put it on the car and trailed it home...



Now I am thinking about the rear ARB

I have read alot about it on this forum and I have an extra front and rear S2 coupe shelf warmers.
With a FARB mounted in the rear the car might be to stiff for a streetcar.
So I was thinking of welding two rears together with metal plates and enough clearance so only one will be mounted.
Thoughts, ideas and experience are very welcomed




what are the plans for the project?














Comment