On Sheet 6, to close things out it is only J44 that we are concerned about. You should have the relay block on the donor loom - I dunno if this fits directly into S2 carrier - its no big deal really but the donor loom will look after connectivity to terminals 30, 85 & 86 on that relay - tracks 56, 57 on the B5 schematic.
All you need to do is wire up N25 by linking the gn/ge wire on donor loom T10p/1 to the S2 at T5g/3 (a green plug in the auxiliary carrier) - the wire should also be gn/ge on the S2.
And that's it for now...
All you need to do is wire up N25 by linking the gn/ge wire on donor loom T10p/1 to the S2 at T5g/3 (a green plug in the auxiliary carrier) - the wire should also be gn/ge on the S2.
And that's it for now...
Comment