I hope you've got some strong beams under that floor!!
Announcement
Collapse
No announcement yet.
Audi quattro S1 E2
Collapse
X
-
Been working on the jig these past couple of days and managed to get the car mounted up on the jig. Big thanks to Jay Birchenall for supplying technical drawings for the shell which helped greatly making the posts.
Slowly getting my eye back in with the welder.
I have got some 100 x 50mm box to bolt across the jig to increase its width to go up into the turrets and front chassis. Will get the front chassis tied into the jig and then get it chopped and shortened over the weekend. Its moving along very nicely I think!
Comment
-
Originally posted by AndyP View PostI hope you've got some strong beams under that floor!!
Hamish, that has got to be one of the coolest garage "solutions" I have seen for a very long time!....
Comment
-
Cracked on with some more work today. Got the front chassis legs tied into the jig. Very happy that it all measures up straight as often they have had a little bump! Ignore the lower panel being damaged it was folded up when i used a jack under it.
That meant the front end could be chopped out giving a lot more space to work around it.
Finally I tied the A and B pillars together to keep them true when the roof comes off.
So over the weekend the shell can be shortened and the roof can come off! Hopefully having the shell tied down will mean nothing moves too far!
Comment
-
Set about the car today. The roof was first in the firing line!
Off she came!
Behold the open top quattro!
Next I set about the B pillar and floor area ready to get it shortened. Bear in mind the idea with this shell is to be as light as possible and it will be more of a spaceframe with a bit of shell left to keep the water out!
Outer arch chopped out:
Bit of strengthening removed:
B pillar was 3 skins:
They got the chop as I only wanted the door shut left it will be tied into the main hoop of the cage.
Rear chassis member cut out as it wont be needed.
Quite a pile of bits cut out!
New B pillars look like they will work nicely:
Same treatment for the other side tomorrow and it will be brought in on the jig and tacked back together.
Comment
-
Cracked on with the shell work today cut the same out of the opposite side first thing:
Cut the last bits holding the 2 halves together:
Sat happily on its legs:
Brought back in and welded under the windows to hold the door shuts. Have left the floor for now until the main hoop is in place then I know where I want the floor to go. Plan is to have the main hoop intersecting the 2 halves of the sill.
Screwed the B pillars in place to get an idea of where they are going to go:
Got over 25kg of metal cut out during shortening:
Finally chopped the dash panel out and opened up the A pillars to get a look at the damage!
How it stands tonight got a good bit more space to walk around it now with the 320mm cut out!
Next job is to get the roof on and sort the rust in the A pillars. Very happy with how its progressing!
Comment
-
Brilliant, I'd love to do one of these.. I'll just post this pic again to save going back to page 1
Comment
Comment