Turbo coolant feed required a slide hammer to pull out.
20241001_105825.jpg
20241001_110335.jpg
Aluminum parts ready to be sent out for vapor blasting.
20241002_092417.jpg
Then it was time to start with the fuel lines.
20241002_141946.jpg
It is going to be tight with the AN fittings at the back but there is just enough room.
20241002_141930.jpg
20241001_105825.jpg
20241001_110335.jpg
Aluminum parts ready to be sent out for vapor blasting.
20241002_092417.jpg
Then it was time to start with the fuel lines.
20241002_141946.jpg
It is going to be tight with the AN fittings at the back but there is just enough room.
20241002_141930.jpg


. Obviously that would be seriously worn engine.
Comment