Da Green Monstah
Collapse
X
-
Tubular frame were bent and welded to the car or previously been designed on paper drawing with dimensions. I ask directly - do you have drawing?
Comment
-
There are no drawings it was a one-off project. The tubular subframe was fabricated to support the new triple anchoring system for the motor, to strengthen a weak area of chassis stiffness, to move the motor back and down a bit, to lighten the front end, and to improve turn-in performance and handling. We'll see if it works out.
Hap, wit dakine tuning of another sort not from Evahboost, MaguireComment
-
Well gentlemen
The long and inglorious wait for my billet 92.8 stroker crank is almost over. It was ready over 2 months ago but this crazy weather that the US East Coast has been suffering through delayed things even further. The tracking info I have shows it arriving on Friday. Here's a cel phone pic for the curious. I am so looking forward to getting back to the build.

Hap, wit dakine crankiness about to end not from Evahboost, MaguireComment
-
1994 URS4 Avant RS2+Comment
-
A small crank specialty company here in the USA. Chassis should be going back together here shortly with the motor about ready to back together. Lots of pics to follow.
Hap, wit dakine cranky info not from Evahboost, MaguireComment
-
Some, sorta-kinda 3 yr old, info aboot that billet hotness http://www.motorgeek.com/viewtopic.php?f=6&t=41648
Comment







What a build thread this is! Will be interesting to see how noticeable all these modifications are when finished
Comment